Low-foam keg tap

From DDL Wiki

(Difference between revisions)
Jump to: navigation, search
(Design Documentation)
(Design Process)
Line 687: Line 687:
Include a short section documenting your team design process for scheduling, coordinating, and completing tasks. Identify individual team member roles, responsibilities, and contributions. Assess the state of the product. Is the design ready for production? If not, what are the next steps (eg. more testing, quantitative market research)?
Include a short section documenting your team design process for scheduling, coordinating, and completing tasks. Identify individual team member roles, responsibilities, and contributions. Assess the state of the product. Is the design ready for production? If not, what are the next steps (eg. more testing, quantitative market research)?
 +
 +
Throughout the semester our team has worked well together.  We have all been flexible with our time, communicated well, and enjoyed collaborating on our low-foam keg tap.  We tried our best to follow the Gannt chart we created in Report 2, though the plan changed slightly here and there.  Scheduling times to meet and coordinating with one another was usually done over the phone or with all of us sitting down together in our group talking about what we want to do.  Completing tasks usually involved the task being completed by one person or various members of the group working together.  When the task was completed it would then be checked and agreed upon by the rest of the group that what has been done is what the group wants to be handed in.  There was never something handed in without the whole groups approval.
==Appendix==
==Appendix==
Include Design analysis data here.
Include Design analysis data here.

Revision as of 15:42, 5 December 2009

Contents

Executive Summary

Provide a brief executive summary summarizing your findings and conclusions. In particular, summarize

  1. Findings from market research justifying need for the new product: Survey distributed; found that users desire a lower foam output, easier pumping mechanism, and more intuitive tap design
  2. The product's main features, advantages over competitors, and target market: center cylinder redesigned to eliminate 90 degree bend in liquid output (straight tube means less foam), final product will include pressure gauge to prevent overpumping; competing products create more foam; target market is beer distributors and college students
  3. The most important findings from your product analyses that justify design choices and support your case for the new product.

Market Analysis

Make the case that there exists a market need for your product using market research findings, illustrative pictures, benchmarking against competitors, and identifying your target market. Estimate a ballpark expected price and production volume for the product and compare against expected cost. Determine if the product has high likelihood to be profitable or unprofitable or if more information is needed to determine. Is there enough potential to justify investment in further market research and testing?

Design Documentation

Include assembly drawings with all components labeled as well as a bill of materials defining each component with quantity, material, etc. Include a fully dimensioned CAD drawing for each custom component and a company and part number for each purchased component.

Whether or not the base is cast or bought depends on the production volume. As of now, the assumption is that the number of taps produced will not make it worth it to make the part. Parts 10-19 can be all bought together from Micro Matic for $41. By buying this sub assembly we are eliminating the manufacturing processes that have high initial costs (such as casting). All of the other pieces of our design can be machined which is beneficial for low volume production. If a large company were making our tap the costs of manufacturing all the pieces would not be a problem and high volume production could be achieved.


Part Number Name QTY Weight (oz) Function Material Manufacturing Process Image CAD drawing/Part Number Estimated Price
1 Handle 1 1 Grip for pumping Stainless Steel lathe, drilled holes, machined threads - -
2 Plunger 2 4.3 Forces air into casing Stainless Steel Extrusion, machined threads Image:KegTap_Plunger.jpg -
2.1 Plunger Disc 2 0.5 Air tight Brass Extrusion, drilled holes -- -
3 Plunger O-Ring 2 0.05 Seal Rubber Injection molding
McMaster-Carr Part # 2418T172 $9.83 per Pack of 30 (0.66$ for 2)
4 Cylindrical Plunger Casing 2 6.3 Pressure for pumping Stainless Steel Extrusion, machined threads Image:KegTap_CylindricalPlungerCasing.jpg -
5 Cylindrical Casing O-Ring 2 0.05 Seal Rubber Injection Molding
-
6 Cylindrical Top 2 1.7 Encloses plunger in casing Stainless Steel Extrusion, lathe, machined threads
-
7 Plunger Spring 2 0.1 Prevents plunger from getting stuck Stainless Steel Extrusion, coiled Image:KepTap_Spring.jpg McMaster-Carr Part # 9434K134 $7.34 per Pack of 5 ($2.94 for 2)
8 Center Cylinder 1 - Separates air input from beer output Stainless Steel Extrusion, mill, lathe, drilled holes, machined threads - -
9 Center Cylinder O-Ring 1 0.05 Seal Rubber Injection molding
-
10 Lever 1 4.1 Attaches tap to keg Steel Cast, machined threads Image:KegTap_Lever.jpg Micro Matic Part # 751-016A 41$ For Parts 10-19
11 Lever Casing 1 0.5 Provides grip for user to pull lever up Plastic Injection molding Image:KegTap_LeverCasing.jpg See Part 10 See Part 10
12 White Cap 1 0.1 Prevents nut from potentially falling off Plastic Injection molding
See Part 10 See Part 10
13 Lever spring 1 0.1 Provides compression that enables lever to lock in place Stainless steel Extrusion, coiled Image:KegTap_LeverSpring1.jpg See Part 10 See Part 10
14 Center Rod 1 0.5 Locks lever into machined groove on base Brass Extrusion, machined threads Image:KegTap_CenterRod.jpg See Part 10 See Part 10
15 Nut 1 0.05 Attaches center rod to lever casing Steel Machined
See Part 10 See Part 10
16 Washer 1 0.05 Distributes force of nut Steel Stamped
See Part 10 See Part 10
17 Lever Pin 1 0.2 Holds lever on base Steel Extrusion, machined Image:KegTap_LeverPin.jpg See Part 10 See Part 10
18 Base 1 7.2 Attaches to keg Steel (Sand) cast Image:KegTap_Base.jpg See Part 10 See Part 10
19 Base O-Ring 1 0.1 Seal Rubber Injection molding
See Part 10 See Part 10
20 Main Block 1 -- Channels air into the center cylinder and provides a straight outlet for the beer Stainless steel - - - _

House of Quality

Provide a complete house of quality table to summarize your design choices, targets, relationships, and benchmarking against the competition. Highlight major findings and conclusions.

Image:HOQ.JPG

Design Analysis

Report on conclusions and recommendations from your DFMA, FMEA, and DFE findings for your product, and benchmark against the competition. Highlight major findings in the report and provide data in the appendix.

  • DFE

Our DFE conclusions from the tap design in use currently, showed that our group should work to reduce the amount of foam created. The foam was the largest component of greenhouse gas emissions associated with our product. Therefore reducing the foam created would be a great way to reduce the impact our product has on the environment. See the appendix for our DFE.

Due to the number and types of changes we have made to the original tap to create our foam-reducing tap, the DFE for our product would be identical to the original tap, with one major change: the amount of foam created by our product is less. The reduced foam creation in our tap means our product will have a reduced impact on the environment.

  • FMEA

The following FMEA is very identical to the FMEA done on the current tap design due to multiple parts being the same. The key differences that should be highlighted are the changes in the handle, the changes in the center cylinder. and the addition of the main block.

The new handle may cause a few new problems, such as improper taping and binding. The old tap design inadvertently forced the user to tap the keg the proper way by grabbing the plastic handle near the base and twisting. Now that our handle for pumping is larger the user may try taping the keg with that part, which may tighten/loosen some of the threaded parts instead of taping the keg. The other problem of binding was cause for concern before the prototype was actually completed. It was thought that having the double barrel may cause the plungers to bind, no allowing the user to pump the tap easily. After completing the prototype and testing multiple times this does not seem to be a problem.

The FMEA done on the original tap led our group to make changes on the center cylinder. It was this part that received the highest RPN (49) the first time around. It received that number due to the flow path it made the beer follow. The testing and mechanical analysis we have done shows that more foam is created when the beer has to go around a 90 degree bend. With that in mind our group decided to redesign this piece so that there were no bends in it, allowing for the least amount of foam to be created in it, ultimately lowering its RPN.

Lastly the main block is a new part added to our re-design. Just as the new handle is a place to tap the keg improperly, the main block could give the user a place to make the same mistake. If tapped by twisting the main block, threaded parts may be tightened or loosened instead of the keg being properly tapped. One way to combat this problem would be to put warning signs on the tap, or to make the handle by the base bigger so the user will want to use that to tap the keg.


Part # Item Function Failure Mode Effects of Failure S Cause of Failure O Design Controls D RPN Recommended Actions
1 Handle Grip for Pumping Could bind while trying to pump Rough pumping 7 Poor Design 1 Design it to function smoothly 1 7 Had no trouble with this in prototype
2 Plungers Force Air into Keg Could be snapped off while locked into keg Unusable 7 Unaware Users 1 Increase diameter 1 7 Even more less likely now
2.1 Plunger Disc Air Tight This part is very robust. Cannot foresee any failure modes. --- - --- - --- - - ---
3 Plunger O-Ring Seal O-ring becomes hardened Loss of air tight seal for pressurizing keg 3 Repeated use and time 2 Oil the o-ring 5 30 Sell spare parts
4 Cylindrical Plunger Casing Supply Keg with Pressure Dent in the casing, burs, scratches, rust on the inside of the casing Plunger cannot be moved inside the case, o-ring gets torn up 7 Misuse, Dropping the tap 1 All these pieces are robust enough 1 7 None
5 Cylindrical Casing O-Ring Seal O-ring becomes hardened Loss of air tight seal for pressurizing keg 3 Repeated use and time 2 Oil the o-ring 5 30 Sell spare parts
6 Cylindrical Top Encloses Plunger in Casing Top comes unscrewed Cannot pressurize keg 1 Human tampering 4 Check that it is screwed on tightly 2 8 None, gluing these threads makes disassembly harder
7 Plunger Spring Prevents Plunger from Getting Stuck Breaks Plunger, though unlikely, may get stuck at top of casing 7 Misuse or fatigue 1 Make sure spring can handle forces 1 7 Sell spare parts
8 Center Cylinder Separates Air Input from Beer Output Creates turbulence in beer flow Foamy beer 7 Manufacturing 2 Their Design 1 14 None
9 Center Cylinder O-Ring Seal O-ring becomes hardened Loss of air tight seal for pressurizing keg 3 Repeated use and time 2 Oil the o-ring 5 30 Sell spare parts
10 Lever Attaches Tap and Keg allowing the flow of beer This part is very robust. Cannot foresee any failure modes. --- - --- - --- - - ---
11 Lever Casing Grip for user Breaks Unable to attach tap to keg 7 Ridiculous Misuse 2 Make sure the part is strong enough 1 14 None
12 White Cap Aesthetics Could break or get lost None 1 Misuse or overuse 2 Check this fit 1 2 None
13 Lever Spring Helps lock tap in two certain positions Impact fatigue Unable to lock tap into open position on keg 7 User misuse 1 Make sure spring can handle forces 2 14 Brainstorm new ways to lock tap
14 Center Rod Helps hold handle together This part is very robust. Cannot foresee any failure modes. --- - --- - --- - - ---
15 Nut Helps hold handle together Could come unscrewed Unable to use tap 7 Repeated use 1 Make sure it is screwed on the whole way 1 7 None
16 Washer Helps hold handle together Cannot foresee any failure modes --- - --- - --- - - ---
17 Lever Pin Attaches the lever to the base and acts as a pivot point for the lever No foreseen failure modes. --- - --- - --- - - ---
18 Base Attaches to Keg Threads become crooked Unable to connect tap to keg 7 Terrible misuse 1 Threads are very robust 2 14 Sell spare parts
19 Base O-Ring Seal O-ring becomes hardened Loss of air tight seal for pressurizing keg 3 Repeated use and time 2 Oil the o-ring 5 30 Sell spare parts


20 Main Block Takes air from cylinder and puts it into the center cylinder 1)Improper Tapping

2) Air leak

1) Over tightening/loosening of threaded parts

2) Unable to maintain pressure in keg

1) 2

2) 6

1)Improper Use

2) Bad seal

1) 4

2) 2

1) Larger handle near base, warnings

2) o-rings

1) 2

2) 2

1) 16

2) 24

1) None

2) None

Looking over the FMEA for the low-foam keg tap, the biggest problem will be o-rings, which we decided in the last FMEA is allowable. O-rings allow for the keg to come in multiple parts, which make it possible to take the tap apart and clean it. Also o-rings are cheap and easy to replace, so an o-ring gone bad is not a terrible occurrence. It does affect the functionality of the tap but it is a quick and easy fix.

  • DFMA

This particular keg tap is made of 22 parts. The non-metal components are made from plastic and rubber, and for the most part are manufactured via injection molding. One potential improvement for the manufacturing of the non-metal components is the o-rings. There are ten o-rings in the keg tap, and 7 different sizes/types of o-rings. This is a potential problem for consumers. The tap is manufactured so the user can take it apart, and it would not work correctly if the o-rings were mixed up and placed in the wrong locations when reassembled. Also, o-ring fatigue is one of the most likely causes of failure; if users are replacing o-rings somewhat regularly, it would be convenient to only order one standard size that can be placed in any of the locations.

The original keg tap had pieces made from brass and stainless steel, a concept we could not explain. In order to keep everything uniform in our design we chose to make everything stainless steel. This way different types of metals will not need to be ordered in bulk, we can simply get stainless steel.

All of the metal components are shaped using a deformation process except for the base and lever, which are cast. Casting is a logical manufacturing choice for the base because of its relatively complex shape. The other main metal parts are extruded, then machined. Machining includes removing material with a lathe or milling machine, drilling holes, cutting threads, and grinding down sharp edges. The amount of machining involved in the manufacturing process is acceptable for this product because it is intended for medium volume production. If the target market increased in size or changed demographics, the current manufacturing processes would have to be reevaluated. An increase in market size would make machining individual parts infeasible. This problem could be solved by either redesigning the tap to have less components, or switching to a process more suitable to high volume production, such as metal injection molding. A change in market demographics, such as a shift in sales from middle-aged beer connoisseurs to college students, would call for a change in the price of the keg tap. This could be achieved by switching to a casting process for more parts; the overall aesthetics might not be as pleasing, but machining costs would go down.

Another way to decrease manufacturing costs is to make more components out of plastic. Plastic injection molding is cheap and fast, at least for high volume production, and produces components lighter than the current metal parts. Injection molding also allows for more freedom in the structure of the tap, since parts are shaped in the mold and not machined. Downsides to increasing the number of plastic components include durability issues and the potential for plastic flavor leeching into the beer.

The keg tap is relatively easy to assemble. All parts are joined by threads or snapped on (o-rings); if given a reference, the average person would be able to put the parts together. This saves machine cost in manufacturing, but increases labor cost. The current joining methods are convenient for the consumer because the tap can be disassembled for cleaning and repair; if an o-ring broke, you could replace it instead of buying a whole new tap.

Overall, the producers of the original keg tap have designed carefully for both manufacturing and assembly, though our switch to all stainless steel will make the purchase of material more efficient.

Mechanical Analysis

Clearly state the purpose of the analysis, methods and assumptions. Define all symbols, and provide a free body diagram, if applicable. Summarize conclusions and implications for you design, and explain how the analysis serves to justify your design choices.

Prototype Documentation

Document your final prototype, explain what it demonstrates about your design, and clearly identify differences between your prototype and final design intended for mass production. Summarize findings from user testing and user feedback.

Design Process

Include a short section documenting your team design process for scheduling, coordinating, and completing tasks. Identify individual team member roles, responsibilities, and contributions. Assess the state of the product. Is the design ready for production? If not, what are the next steps (eg. more testing, quantitative market research)?

Throughout the semester our team has worked well together. We have all been flexible with our time, communicated well, and enjoyed collaborating on our low-foam keg tap. We tried our best to follow the Gannt chart we created in Report 2, though the plan changed slightly here and there. Scheduling times to meet and coordinating with one another was usually done over the phone or with all of us sitting down together in our group talking about what we want to do. Completing tasks usually involved the task being completed by one person or various members of the group working together. When the task was completed it would then be checked and agreed upon by the rest of the group that what has been done is what the group wants to be handed in. There was never something handed in without the whole groups approval.

Appendix

Include Design analysis data here.