Talk:Engineering Design II - Conceptualization and Realization Course
From DDL Wiki
(Difference between revisions)
Current revision (15:40, 5 December 2008) (view source) (→Design Exposition Presentation Schedule) |
|||
(35 intermediate revisions not shown.) | |||
Line 4: | Line 4: | ||
{| class="wikitable" style="font-size:85%; text-align:center; width:auto;" border="1" cellspacing="0" | {| class="wikitable" style="font-size:85%; text-align:center; width:auto;" border="1" cellspacing="0" | ||
|- | |- | ||
- | | style="width:100px"|Schedule || style="width:300px"|Design Project Team | + | | style="width:100px"|'''Schedule''' || style="width:300px"|'''Design Project Team''' |
|- | |- | ||
- | | 9:00-9:15am || | + | | 9:00-9:15am ||Team 7: Ski Boot |
|- | |- | ||
| 9:20-9:35am || | | 9:20-9:35am || | ||
|- | |- | ||
- | | 9:40-9:55am || | + | | 9:40-9:55am ||Team 10: Ice Maker |
|- | |- | ||
- | | 10:00-10:15am || | + | | 10:00-10:15am ||Team 3: Umbrella |
|- | |- | ||
- | | 10:20-10:35am || | + | | 10:20-10:35am ||Team 2: Post hole digger |
|- | |- | ||
- | | 10:40-10:55am || | + | | 10:40-10:55am || |
|- | |- | ||
- | | 11:00-11:15am || | + | | 11:00-11:15am ||Team 8: iPod Charging Exercise Bike |
|- | |- | ||
- | | 11:20-11:35am || | + | | 11:20-11:35am ||Team 12: Weed Trimmer |
|- | |- | ||
- | | 11:40-11:55am || | + | | 11:40-11:55am ||Team 5: Lamp Stand Mechanical Arm |
|- | |- | ||
| 12:00-12:40pm || ''LUNCH BREAK'' | | 12:00-12:40pm || ''LUNCH BREAK'' | ||
|- | |- | ||
- | | 12:40-12:55pm || | + | | 12:40-12:55pm ||Team 6: Guitar Bridge |
|- | |- | ||
- | | 1:00-1:15pm || | + | | 1:00-1:15pm ||Team 4: Baby Stroller |
|- | |- | ||
- | | 1:20-1:35pm || | + | | 1:20-1:35pm || |
|- | |- | ||
- | | 1:40-1:55pm || | + | | 1:40-1:55pm || Team 1: Toaster |
|- | |- | ||
| 2:00-2:15pm || | | 2:00-2:15pm || | ||
Line 38: | Line 38: | ||
| 2:20-2:35pm || | | 2:20-2:35pm || | ||
|- | |- | ||
- | | 2:40-2:55pm || | + | | 2:40-2:55pm || |
|- | |- | ||
| 3:00-3:15pm || | | 3:00-3:15pm || | ||
|- | |- | ||
- | | 3:20-3:35pm || | + | | 3:20-3:35pm || Team 9: Lawn Mower |
|- | |- | ||
| 3:40-3:55pm || | | 3:40-3:55pm || | ||
Line 48: | Line 48: | ||
| 4:00-4:15pm || | | 4:00-4:15pm || | ||
|- | |- | ||
- | | 4:20-4:35pm || | + | | 4:20-4:35pm || Team 11: RC Truck |
|- | |- | ||
| 4:40-4:55pm || | | 4:40-4:55pm || | ||
Line 57: | Line 57: | ||
The table is for each team's special needs in the Design Expo. We need the information ahead in order to arrange the table locations. By default each team will have a table with tablecloth, and the poster and prototype will be on the table. | The table is for each team's special needs in the Design Expo. We need the information ahead in order to arrange the table locations. By default each team will have a table with tablecloth, and the poster and prototype will be on the table. | ||
- | *If your team needs power socket for your laptop or product demonstration, | + | *If your team needs power socket for your laptop or product demonstration, enter '''the number of sockets needed''' in the power socket column. |
*If your product requires any floor space or any space beyond the table, please mark "X" in the "large space" column. This is important because the demonstration should not interfere the traffic flow in the UC common area. | *If your product requires any floor space or any space beyond the table, please mark "X" in the "large space" column. This is important because the demonstration should not interfere the traffic flow in the UC common area. | ||
- | *Other special needs, please contact TA Norman (cshiau@cmu.edu). | + | *Other special needs, please fill in the "other notes" column or contact TA Norman (cshiau@cmu.edu). |
{|class="wikitable" style="font-size:85%; text-align:center; width:auto;" border="1" cellspacing="0" | {|class="wikitable" style="font-size:85%; text-align:center; width:auto;" border="1" cellspacing="0" | ||
Line 65: | Line 65: | ||
| Team || style="width:50px"|Power socket || style="width:50px"|Large space || Other notes | | Team || style="width:50px"|Power socket || style="width:50px"|Large space || Other notes | ||
|- | |- | ||
- | | 1 Toaster || | + | | 1 Toaster || 3 || || |
|- | |- | ||
- | | 2 Digger || | + | | 2 Digger || 1 || X || |
|- | |- | ||
- | | 3 Umbrella || | + | | 3 Umbrella || 1 || X || |
|- | |- | ||
- | | 4 Stroller || | + | | 4 Stroller || || X || |
|- | |- | ||
- | | 5 Lamp-arm || | + | | 5 Lamp-arm || 3 || || |
|- | |- | ||
- | | 6 Guitar || | + | | 6 Guitar || 1 || || |
|- | |- | ||
- | | 7 Ski-boot || | + | | 7 Ski-boot || 1 || || |
|- | |- | ||
- | | 8 Bike || || | + | | 8 Bike || || X || |
|- | |- | ||
- | | 9 Lawnmower || | + | | 9 Lawnmower || 2 || X || |
|- | |- | ||
- | | 10 Ice maker|| | + | | 10 Ice maker|| 1 || || |
|- | |- | ||
- | | 11 RC Truck || | + | | 11 RC Truck || 2 || X || |
|- | |- | ||
- | | 12 Trimmer || | + | | 12 Trimmer || 0 || || |
|- | |- | ||
|} | |} |
Current revision
Design Exposition Presentation Schedule
Please fill in your team number and project name in the following table for presentation schedule:
Schedule | Design Project Team |
9:00-9:15am | Team 7: Ski Boot |
9:20-9:35am | |
9:40-9:55am | Team 10: Ice Maker |
10:00-10:15am | Team 3: Umbrella |
10:20-10:35am | Team 2: Post hole digger |
10:40-10:55am | |
11:00-11:15am | Team 8: iPod Charging Exercise Bike |
11:20-11:35am | Team 12: Weed Trimmer |
11:40-11:55am | Team 5: Lamp Stand Mechanical Arm |
12:00-12:40pm | LUNCH BREAK |
12:40-12:55pm | Team 6: Guitar Bridge |
1:00-1:15pm | Team 4: Baby Stroller |
1:20-1:35pm | |
1:40-1:55pm | Team 1: Toaster |
2:00-2:15pm | |
2:20-2:35pm | |
2:40-2:55pm | |
3:00-3:15pm | |
3:20-3:35pm | Team 9: Lawn Mower |
3:40-3:55pm | |
4:00-4:15pm | |
4:20-4:35pm | Team 11: RC Truck |
4:40-4:55pm |
Additional Needs
The table is for each team's special needs in the Design Expo. We need the information ahead in order to arrange the table locations. By default each team will have a table with tablecloth, and the poster and prototype will be on the table.
- If your team needs power socket for your laptop or product demonstration, enter the number of sockets needed in the power socket column.
- If your product requires any floor space or any space beyond the table, please mark "X" in the "large space" column. This is important because the demonstration should not interfere the traffic flow in the UC common area.
- Other special needs, please fill in the "other notes" column or contact TA Norman (cshiau@cmu.edu).
Team | Power socket | Large space | Other notes |
1 Toaster | 3 | ||
2 Digger | 1 | X | |
3 Umbrella | 1 | X | |
4 Stroller | X | ||
5 Lamp-arm | 3 | ||
6 Guitar | 1 | ||
7 Ski-boot | 1 | ||
8 Bike | X | ||
9 Lawnmower | 2 | X | |
10 Ice maker | 1 | ||
11 RC Truck | 2 | X | |
12 Trimmer | 0 |