Ski rack bill of materials
From DDL Wiki
(Difference between revisions)
(→Bill of Materials) |
(→Bill of Materials) |
||
Line 29: | Line 29: | ||
| Connects bracket to rack. | | Connects bracket to rack. | ||
| Steel | | Steel | ||
- | | | + | | Cold Heading and Thread Rolling |
| 6 | | 6 | ||
| [[Image:SkiRack_longScrew_.jpg|100px]] | | [[Image:SkiRack_longScrew_.jpg|100px]] | ||
Line 36: | Line 36: | ||
| 1B. Slider Top | | 1B. Slider Top | ||
| 1 | | 1 | ||
- | | | + | | Connects the bails to the lower horizontal cross bar. |
| Molded Plastic | | Molded Plastic | ||
| Injection Molding | | Injection Molding | ||
Line 45: | Line 45: | ||
| 1C. Short Bail Screw | | 1C. Short Bail Screw | ||
| 2 | | 2 | ||
- | | | + | | Holds the bails together |
| Steel | | Steel | ||
- | | | + | | Cold Heading and Thread Rolling |
| 6 | | 6 | ||
| [[Image:SkiRack_shortScrew.JPG|100px]] | | [[Image:SkiRack_shortScrew.JPG|100px]] | ||
Line 54: | Line 54: | ||
| 1D. Long Bail Screw | | 1D. Long Bail Screw | ||
| 2 | | 2 | ||
- | | | + | | Holds the bails together |
| Steel | | Steel | ||
- | | | + | | Cold Heading and Thread Rolling |
| 9 | | 9 | ||
| [[Image:SkiRack_longScrew_.jpg|100px]] | | [[Image:SkiRack_longScrew_.jpg|100px]] | ||
Line 63: | Line 63: | ||
| 1E. Upper Bail | | 1E. Upper Bail | ||
| 1 | | 1 | ||
- | | | + | | Clamps over roof rack cross bar. |
| Molded Plastic | | Molded Plastic | ||
| Injection Molding | | Injection Molding | ||
Line 72: | Line 72: | ||
| 1F. Square Nut | | 1F. Square Nut | ||
| 1 | | 1 | ||
- | | | + | | Provides purchase for the base screw withing the slider top. |
| Brass | | Brass | ||
- | | | + | | Forging and tapping |
| 5 | | 5 | ||
| [[Image:SkiRack_squareNut.jpg|100px]] | | [[Image:SkiRack_squareNut.jpg|100px]] | ||
Line 81: | Line 81: | ||
| 1G. Rubber Pad | | 1G. Rubber Pad | ||
| 1 | | 1 | ||
- | | | + | | Provides grip to the bails. |
| Rubber | | Rubber | ||
- | | | + | | Casting |
| 13 | | 13 | ||
| [[Image:SkiRack_rubberPad_.jpg|100px]] | | [[Image:SkiRack_rubberPad_.jpg|100px]] | ||
Line 90: | Line 90: | ||
| 1H. Lower Bail | | 1H. Lower Bail | ||
| 1 | | 1 | ||
- | | | + | | Clamps under roof rack cross bar. |
| Molded Plastic | | Molded Plastic | ||
| Injection Molding | | Injection Molding | ||
Line 99: | Line 99: | ||
| 1I. Hex Nut | | 1I. Hex Nut | ||
| 1 | | 1 | ||
- | | | + | | Provides purchase for the bail screws within the lower bail. |
| Brass | | Brass | ||
- | | | + | | Forging and tapping |
| 5 | | 5 | ||
| [[Image:HexNut.JPG|100px]] | | [[Image:HexNut.JPG|100px]] | ||
Line 108: | Line 108: | ||
| | | | ||
| 2 | | 2 | ||
- | | | + | | Attaches the ski lift to the ski rack. |
| | | | ||
| | | | ||
Line 117: | Line 117: | ||
| 2A. Hex Key | | 2A. Hex Key | ||
| 1 | | 1 | ||
- | | | + | | Holds the ski lift in place. |
| Molded Plastic | | Molded Plastic | ||
| Injection Molding | | Injection Molding | ||
Line 126: | Line 126: | ||
| 2B. Hex Nut | | 2B. Hex Nut | ||
| 1 | | 1 | ||
- | | | + | | Provides purchase for the bold within the hex key. |
| Brass | | Brass | ||
- | | | + | | Forging and tapping |
| 5 | | 5 | ||
| [[Image:HexNut.JPG|100px]] | | [[Image:HexNut.JPG|100px]] | ||
Line 135: | Line 135: | ||
| 2C. Bolt | | 2C. Bolt | ||
| 1 | | 1 | ||
- | | | + | | Connects with the hex key through the ski lift to attached the ski lift |
| Steel | | Steel | ||
- | | | + | | Cold Heading and Thread Rolling |
| 12 | | 12 | ||
| [[Image:HexKeyBolt.JPG|100px]] | | [[Image:HexKeyBolt.JPG|100px]] | ||
Line 164: | Line 164: | ||
| Press fits into ski lift to provide secure purchase for mounting screws. | | Press fits into ski lift to provide secure purchase for mounting screws. | ||
| Brass | | Brass | ||
- | | | + | | Forging and tapping |
| 5 | | 5 | ||
| [[Image:HexNut.JPG|100px]] | | [[Image:HexNut.JPG|100px]] | ||
Line 173: | Line 173: | ||
| Holds ski lift together. | | Holds ski lift together. | ||
| Steel | | Steel | ||
- | | | + | | Cold Heading and Thread Rolling |
| 11 | | 11 | ||
| [[Image:HexKeyBolt.JPG|100px]] | | [[Image:HexKeyBolt.JPG|100px]] | ||
Line 193: | Line 193: | ||
| Casting | | Casting | ||
| | | | ||
- | | | + | | [[Image:SkiRack_lockHousing.jpg]] |
|- | |- | ||
| | | | ||
Line 200: | Line 200: | ||
| Preassembled lock. | | Preassembled lock. | ||
| Steel | | Steel | ||
- | | | + | | Unknown multi-part assembly process. |
| 10 | | 10 | ||
| [[Image:SkiRack_lock_.jpg|100px]] | | [[Image:SkiRack_lock_.jpg|100px]] | ||
Line 211: | Line 211: | ||
| Injection Molding | | Injection Molding | ||
| 0 | | 0 | ||
- | | | + | | [[Image:SkiRack_lockCap.jpg|100px]] |
|- | |- | ||
| 5. Carrier Bottom | | 5. Carrier Bottom | ||
Line 227: | Line 227: | ||
| Holds rack together | | Holds rack together | ||
| Aluminum | | Aluminum | ||
- | | | + | | |
| 0 | | 0 | ||
| [[Image:Rivet2.JPG|100px]] | | [[Image:Rivet2.JPG|100px]] | ||
Line 236: | Line 236: | ||
| Opens rack. | | Opens rack. | ||
| Brass | | Brass | ||
- | | | + | | Coiling |
| 15 | | 15 | ||
| [[Image:SkiRack_hingeSpring_.jpg|100px]] | | [[Image:SkiRack_hingeSpring_.jpg|100px]] | ||
Line 317: | Line 317: | ||
| Returns the latch release lever to its closed position | | Returns the latch release lever to its closed position | ||
| Brass | | Brass | ||
- | | | + | | Coiling |
| 4 | | 4 | ||
| [[Image:SkiRack_latchSpring_.jpg|100px]] | | [[Image:SkiRack_latchSpring_.jpg|100px]] |
Revision as of 17:28, 7 February 2011
Bill of Materials