Umbrella check-out system

From DDL Wiki

(Difference between revisions)
Jump to: navigation, search
(New page: Final Wiki outline for ED2 ==Executive Summary== ==Design== ===Objectives and Opportunities=== Why we believe that this is a feasible idea, user study quotes ===Physical Design=== Compon...)
(First Prototype)
Line 18: Line 18:
====First Prototype====
====First Prototype====
Our initial design.
Our initial design.
 +
[[Image:prototype1.jpg]]<br>
 +
====Second Prototype====
====Second Prototype====
Changes for our second prototype.
Changes for our second prototype.

Revision as of 12:53, 5 December 2008

Final Wiki outline for ED2

Contents

Executive Summary

Design

Objectives and Opportunities

Why we believe that this is a feasible idea, user study quotes

Physical Design

Component design, and how the unit operates.

Distribution and Placement

Discuss how units would be placed and distributed.

Failure Modes

FMEA table

Manufacturing and Production

DFMA details, production volume

Prototype History

Discuss changes in our design through time.

First Prototype

Our initial design. Image:prototype1.jpg

Second Prototype

Changes for our second prototype.

Final Concept

Differences between our second and final prototypes.

Analysis

Comparison of Alternatives

QFD, etc can go here.

Quantitative Analysis: Traffic Study

Summarize our findings here, link back to main analysis page

Conclusions

Personal tools