Umbrella check-out system
From DDL Wiki
(Difference between revisions)
(New page: Final Wiki outline for ED2 ==Executive Summary== ==Design== ===Objectives and Opportunities=== Why we believe that this is a feasible idea, user study quotes ===Physical Design=== Compon...) |
(→First Prototype) |
||
Line 18: | Line 18: | ||
====First Prototype==== | ====First Prototype==== | ||
Our initial design. | Our initial design. | ||
+ | [[Image:prototype1.jpg]]<br> | ||
+ | |||
====Second Prototype==== | ====Second Prototype==== | ||
Changes for our second prototype. | Changes for our second prototype. |
Revision as of 12:53, 5 December 2008
Final Wiki outline for ED2
Contents |
Executive Summary
Design
Objectives and Opportunities
Why we believe that this is a feasible idea, user study quotes
Physical Design
Component design, and how the unit operates.
Distribution and Placement
Discuss how units would be placed and distributed.
Failure Modes
FMEA table
Manufacturing and Production
DFMA details, production volume
Prototype History
Discuss changes in our design through time.
First Prototype
Second Prototype
Changes for our second prototype.
Final Concept
Differences between our second and final prototypes.
Analysis
Comparison of Alternatives
QFD, etc can go here.
Quantitative Analysis: Traffic Study
Summarize our findings here, link back to main analysis page